Work on the main house started in January 2008.
Steve digs out for the house foundations
Steve filled the trenches with concrete
Steve built a supporting wall and put in the hard core
Steve and Keith fitted the boxing on top of the wall ready to pour the slab
The framework for the walls and roof trusses etc. are delivered
The plumbing was sunk into the hard core
Keith wires together the reo
The concrete slab is poured
Steve smooths off the slab with the helicopter
The container with doors, windows, insulation etc.
The contents of the container are inspected
Keith and Amelia take a tea break
The ground floor framework showing the view from the lounge windows
A view of the ground floor framework from the shed
The ground floor framework almost completed
First floor framework under way
First floor framework under way
First floor framework nearing completion
Roof is part timbered