Steve and Belinda Loxley, sandb, sandbdownunder
Work on the main house started in January 2008.
Steve digs out for the house foundations   Steve filled the trenches with concrete
Steve digs out for the house foundations   Steve filled the trenches with concrete
Steve built a supporting wall and put in the hard core   Steve built a supporting wall and put in the hard core
Steve built a supporting wall and put in the hard core
Steve digs out for the house foundations   The framework for the wallsand roof trusses etc. are delivered
Steve and Keith fitted the boxing on top of the wall ready to pour the slab   The framework for the walls and roof trusses etc. are delivered
The plumbing was sunk into the hard core   Keith wires together the reo
The plumbing was sunk into the hard core   Keith wires together the reo
The concrete slab is poured   Steve smooths off the slab with the helicopter
The concrete slab is poured   Steve smooths off the slab with the helicopter
The container with doors, windows, insulation etc.   The contents of the container are inspected
The container with doors, windows, insulation etc.   The contents of the container are inspected
Keith and Amelia take a tea break   The framework showing the view from the lounge windows
Keith and Amelia take a tea break   The ground floor framework showing the view from the lounge windows
A view of the framework from the shed   The ground floor framework almost completed
A view of the ground floor framework from the shed   The ground floor framework almost completed
First floor framework under way   First floor framework under way
First floor framework under way   First floor framework under way
First floor framework nearing completion   Roof is part timbered
First floor framework nearing completion   Roof is part timbered
     